Process Design Project

A UK fabrication company awarded Proxion a process design contract on a chemical bulk storage vessel.

Proxion Process engineers designed a liquid spray bar intergrated with 360° spray balls to give 100 percent wetting coverage along the upper section of the vessel.

Challenges

A challenge our engineers were faced with was having to submit the project within a short frame of time.

Please click here to see our full reference list.

Location

UK

Products/Services

Scope

Process design contract on a chemical bulk storage vessel

Contract

Design

Timeline

2 weeks

Completion Date

April 2014

Safety First (HSE)

Proxion Process HSE